Explainer
Why doesn't a sawmill always cut the maximum possible volume of lumber?
Because volume is not what it is trying to maximise.
Because volume is not what it is trying to maximise. A modern mill scans each log, builds a model of it, and hands that to an optimizer which chooses the log’s rotation and cutting pattern against an objective function — and that objective is usually value, not cubic metres. The pattern that yields the greatest volume of lumber and the pattern that yields the most valuable set of pieces are rarely the same pattern. Choosing the second one means deliberately leaving volume on the table.
The optimizer maximises what has been encoded in it: prices, grades, the order book, machine constraints, and product rules. Nothing about it reaches for an undefined universal optimum. Two mills running identical logs with different price files will cut them differently, and the same mill will cut the same log differently on a day when its order book has changed. A wide board that grades high is worth more than the several narrow ones the same log could have produced, and a stud order that has to ship will pull the pattern toward studs regardless of what the log would have preferred to be.
This is why product mix behaves as a variable rather than a fact about the mill. One sawmill can shift among studs, dimension lumber, timbers, and chips over a period, and that distribution shapes revenue, recovery, capacity, and exposure to demand. It also produces a result that surprises people reading financial statements: an average selling price can move without any individual product price moving, purely because the mix shifted. Price effects and mix effects need separating before either can be read.
The optimizer’s chosen pattern is also not necessarily the one that happens. Scan error, defects hidden inside the log, stale prices or grade rules, actuator error, kerf and variation mismatches, and downstream bottlenecks all open a gap between the commanded cut and the actual one. Simulated gains stay hypotheses until they are checked against traced outcomes at the mill, and a percentage improvement reported at one installation does not transfer to another with a different baseline.
Related concepts: log scanning, objective function, product mix, lumber recovery, order fulfilment.
Asked on the floor
- What does the optimizer actually maximise?
- Whatever its objective function encodes — value, volume, order fulfilment, or something else. There is no undefined universal optimum it is reaching for; the objective is a setting.
- Does the optimizer always get the cut it chose?
- No. Scan error, hidden internal defects, actuator error, and kerf variation all put distance between the commanded cut and the actual one, which is why realised value is checked against traced mill outcomes.
- Can average selling price change without any price changing?
- Yes, and this catches people out. A shift in the mix of products, grades, dimensions, species, or destinations moves the average even when no individual item price has moved. Price and mix effects have to be separated.
- Can a mill just switch to more valuable products?
- Only within its constraints. The log supply, machine capability, order book, and downstream capacity all bound the achievable mix, and the optimizer works inside those limits rather than around them.