Ancillary services

Ancillary services support reliable power-system operation in addition to energy supply.

Ancillary services support reliable power-system operation in addition to energy supply. They are what keeps a grid stable between the moments when energy is bought and sold: holding frequency at its target, maintaining voltage, keeping reserves available for a sudden loss, and being able to restart the system if it goes down. The energy market pays for electricity; ancillary services pay for the conditions that let electricity be delivered.

The list varies by jurisdiction and typically includes operating reserve, regulation, fast frequency response, reactive support and voltage control, black start, and reliability must-run service. Ontario’s system operator lists black start, regulation, reactive and voltage support, and reliability must-run among its contracted services. Alberta’s operator procures its own set and describes operating reserve, transmission must-run and fast frequency response arrangements. The categories overlap and the definitions do not.

Each service answers a distinct physical need. Regulation corrects small continuous mismatches between generation and load. Operating reserve covers the sudden loss of a large resource. Fast frequency response acts in the seconds after a disturbance. Reactive support and voltage control keep voltage within limits across the network. Black start restores the system from nothing. Reliability must-run keeps a specific unit available because of where it sits on the network.

The same family travels under other names. “Grid services” is an informal umbrella term, used most often for what storage, demand response or aggregated resources can sell; it has no fixed legal meaning. “Balancing services” is a defined term in European law: balancing energy or balancing capacity, or both. Balancing energy is energy a transmission system operator uses to balance the system. Balancing capacity is reserve capacity that a provider has agreed to hold, together with an obligation to bid the corresponding balancing energy to the operator for the duration of the contract.

A balancing service provider, in the same law, is a market participant with reserve-providing units or groups able to supply those services to transmission system operators. European reserves are classed by job. Frequency containment reserves contain frequency after an imbalance. Frequency restoration reserves, activated automatically or manually, bring frequency back to nominal. Replacement reserves restore the stock of restoration reserves so the system is ready for the next imbalance.

The categories map loosely onto North American regulation and operating reserve, not one to one. In North America, NERC’s BAL-002 standard requires a balancing authority to balance resources and demand and return its area control error to defined values after a reportable contingency, and contingency reserve exists to make that recovery possible. Because the European reserves are defined as active power reserves, voltage support and black start sit outside “balancing” in that vocabulary, although they remain ancillary services.

Qualifying is a technical matter rather than a category. A provider must meet response time, accuracy, telemetry, availability, duration and location requirements for the specific service. Generation, storage, controllable load, transmission equipment and aggregated resources may all qualify under different rules, and a resource that qualifies for one service may fail the requirements of another.

Two quantities are settled and they are not the same. Reserved megawatts are availability or capability — the right to call on a resource. Activated megawatt-hours are energy actually delivered when the service was called. A resource can earn for standing ready and never deliver anything, which is the point of a reserve.

Location matters more than in the energy market. Reactive support and voltage control act locally, and reliability must-run exists precisely because a particular unit at a particular place is needed. A megawatt of service in the wrong location does not substitute for one in the right place.

Ontario shows what this looks like in practice. Its operator, the IESO, contracts for four services: certified black start facilities, regulation service, reactive support and voltage control service, and reliability must-run. Black start cost about $1.9 million in 2025, from four facilities, with a planned reduction to three. Regulation is provided by generation facilities with automatic generation control. The market rules require at least ±100 MW at all times; in 2025 the IESO held ±169.3 MW of nominal contracted capacity from 15 facilities, at a cost of about $48.6 million. Its 2025 planning outlook identified a need for a further ±30 MW, which would raise the typical scheduled amount to ±130 MW, and the IESO expects to negotiate it with new suppliers.

Every injecting generator in Ontario must provide a base level of reactive support and voltage control under the market rules, and the IESO contracts with some facilities for more, at about $24.3 million in 2025. A reliability must-run contract obliges its holder to offer a specified amount of energy, operating reserve or both into the market; none was in effect from 2023 through 2025.

Operating reserve in Ontario is not contracted but bought in the market. Dispatchable generators and loads offer three classes: 10-minute synchronized, 10-minute non-synchronized and 30-minute. Reserve and energy are scheduled together, with a reserve price set every five minutes and stand-by payments for every megawatt selected, whether or not it is activated. Since the renewed market began on 1 May 2025, reserve is procured in both the day-ahead and real-time markets. The requirement follows NERC and NPCC standards: the largest single contingency plus half of the second largest, which the IESO describes as typically the loss of Ontario’s one and a half largest generators.

Alberta packages the same functions differently. The AESO lists operating reserve, transmission must-run, blackstart and load shed service for imports, and describes fast frequency response separately. Operating reserve is bought daily from generators and loads on Watt-Ex, a day-ahead online exchange, with prices that vary by product; everything else is contracted, transmission must-run case by case.

Alberta’s operating reserve comes in three products. Regulating reserve supplies the instantaneous difference between supply and demand. Spinning reserve, synchronized to the grid, is the fastest-acting contingency reserve. Supplemental reserve need not be synchronized. Spinning and supplemental together form contingency reserve. The AESO buys an active portfolio for normal conditions and a standby portfolio for when the active one falls short, in volumes set by WECC reliability standards.

Fast frequency response in Alberta is currently supplied through load shed service for imports, under which contracted loads are taken offline quickly when frequency drops. A pilot from early 2022 to early 2023 bought 30 MW from two providers, with a maximum response time of 18 cycles (0.3 seconds) once frequency fell to 59.6 Hz. The AESO is now moving the service to a recurring competitive procurement open to load, battery storage and other capable technologies, priced every six months. Registration and the first pricing round took place in June 2026, and the pricing window for the April to September 2027 service period runs from 23 November to 11 December 2026.

Two comparisons across jurisdictions fail for the same underlying reason and in different directions.

Service names do not transfer. Two operators can use the same words for products with different response times, durations and settlement, so matching by name produces a false equivalence.

Procurement volumes do not transfer either. How much of a service a system buys reflects its resource mix, network topology and reliability standards, so a larger reserve requirement indicates a different system rather than a less reliable one.

Ontario and Alberta show both failures. Each buys regulation, and the shared word hides different arrangements: Ontario contracts with a fixed set of facilities against a ±100 MW floor and treats regulation as separate from operating reserve, while Alberta buys regulating reserve daily on an exchange as one of its three operating reserve products. Ontario divides contingency reserve by response time and synchronization; Alberta divides it into spinning and supplemental. And Ontario’s ±169.3 MW is a nominal contracted capacity for a year, while an Alberta regulating reserve volume is a daily purchase under WECC standards. Placed side by side, the two numbers measure different things.

Asked on the floor

Are ancillary services the same everywhere?
No. Product names, technical requirements, procurement and settlement differ by operator, so two provinces' services cannot be compared by name alone.
Can a battery provide ancillary services?
It can where it meets the requirements. Generation, storage, controllable load, transmission equipment and aggregated resources may qualify under different rules for different services.
Is reserved capacity the same as delivered energy?
No. Reserved MW is availability or capability; activated MWh is energy actually delivered when the service was called. They are measured and settled separately.
What is black start?
The capability to restart generation without drawing power from the grid, used to restore a system after a widespread outage. Both Ontario's and Alberta's operators contract with generators for it; Ontario had four certified facilities in 2025.
What are grid services?
An informal umbrella term, used most often for what storage, demand response or aggregated resources can sell to a grid operator. It overlaps with ancillary services but has no fixed legal definition.
What is a balancing service provider?
A European legal term: a market participant whose units or groups can supply balancing energy, balancing capacity or both to a transmission system operator. North American markets describe the same role in terms of regulation and operating reserve.

Sources

  1. Independent Electricity System Operator — Ancillary Services
  2. Alberta Electric System Operator — Ancillary Services
  3. North American Electric Reliability Corporation — Reliability Standards
  4. Independent Electricity System Operator — Operating Reserve Markets
  5. Independent Electricity System Operator — Markets Overview
  6. Independent Electricity System Operator — Guiding Documents for the Transition to the Renewed Market
  7. Alberta Electric System Operator — Operating Reserve
  8. Alberta Electric System Operator — Fast Frequency Response
  9. Alberta Electric System Operator — Market-Based Fast Frequency Response
  10. North American Electric Reliability Corporation — BAL-002-3, Disturbance Control Standard
  11. Commission Regulation (EU) 2017/2195, electricity balancing guideline, Article 2
  12. Commission Regulation (EU) 2017/1485, transmission system operation guideline, Article 3